EV

The EV charging network, planned, energized and operating, on one platform.

The EV charging network runs on one platform, from planned sites to live kilowatt-hours. AI-scored site planning, a rollout funnel from proposed to live, grid-interconnection and DISCOM SLA tracking, and live operations across throughput, energy and uptime share a single view. Sites are planned on evidence, the grid critical path is tracked from day one, and the live network is operated end to end.

Plan, energize, live
The whole rollout, one funnel
Grid critical path
DISCOM SLA from day one
Sites AI-scored
Planned on evidence
Network operated
Throughput, energy and uptime

EV, area by area.

Site planning

The next site, chosen on evidence.

AI scores candidate sites by demand and density, so the highest-scoring clusters are surfaced and capital goes to the sites that will be used.

  • AI-scored site planning
  • Demand and density signals
  • Highest-scoring clusters surfaced
  • Capital to sites that earn

Rollout funnel

Every site, proposed to live.

Each site moves through proposed, survey, construction, commissioning and live on one funnel, so the whole rollout is tracked in one place.

  • Proposed to live funnel
  • Survey, construction, commissioning
  • Every site through its stages
  • The whole rollout in one view

Grid interconnection & DISCOM SLA

The grid critical path, tracked from day one.

Grid interconnection, DISCOM SLAs and long-lead substation items are tracked from project start, so energization stays on the critical path and is caught early.

  • Grid interconnection tracking
  • DISCOM SLA from day one
  • Long-lead substation items
  • Energization on the critical path

Network operations

The live network, operated end to end.

Stations across the network are operated on the same platform as the rollout, so the build pipeline and the live network are one picture.

  • Live network operations
  • Stations across the network
  • One platform with the rollout
  • Build and live, one picture

Throughput, energy & uptime

A network that earns.

Throughput, energy delivered and uptime stream live across the network, so a live network is operated for revenue.

  • Throughput and energy delivered
  • Uptime tracked live
  • Performance across the network
  • Operated for revenue

Charging network map

The whole network on one map.

Planned, energizing and live stations show on one charging-network map, so the rollout funnel and the live network are seen together.

  • Charging network map
  • Planned, energizing and live
  • Funnel and network together
  • Status across the network

EV, end to end.

  1. Plan on evidence

    AI scores candidate sites by demand and density, so capital goes to the sites that will be used.

  2. Roll out the funnel

    Each site moves from proposed to live on one funnel.

  3. Track the grid critical path

    Grid interconnection and DISCOM SLAs are tracked from day one.

  4. Operate the live network

    Stations are operated on the same platform as the rollout.

  5. Measure what earns

    Throughput, energy delivered and uptime stream live across the network.

The network, from plan to live kilowatt-hours.

Entroid runs the EV charging network as one platform, from AI-scored site planning to a live network that earns.