Telecom

Every network site, from plan to on-air, on one command center.

The network build runs on one command center. Every macro, small-cell, DAS and C-RAN site shares a single geospatial view, with a Build, Integration and On-Air activation pipeline, RF coordination and geo-fenced permits, so the stalling stage is surfaced and sites reach on-air faster.

Bottleneck named
The stage stalling on-air
Velocity, live
Sites per week to on-air
Permits unblocked
Jurisdictional holds surfaced early
Every site, one map
Plan to on-air, geospatial

Telecom, area by area.

Geospatial network map

Every site on one map.

Macro, small-cell, DAS and C-RAN sites show on one geospatial map, so the whole build is seen in place.

  • Macro, small-cell, DAS, C-RAN
  • Geospatial site map
  • Whole build in place
  • Backhaul and geo-fences

Activation pipeline

Build to Integration to On-Air.

Each site moves through Build, Integration and On-Air stages on one pipeline, so progress to on-air is tracked stage by stage.

  • Build, Integration, On-Air stages
  • Site progress tracked
  • Stage flow in view
  • Plan to on-air pipeline

Rollout velocity & bottlenecks

Pace to on-air, measured.

Rollout velocity and stage flow are live, so the pace to on-air is measured and the highest-leverage move is surfaced.

  • Sites per week to on-air
  • Bottleneck stage named
  • Highest-leverage move surfaced
  • Velocity tracked live

RF coordination & backhaul

RF coordinated in place.

RF coordination and backhaul sit on the same geospatial map as the sites, so coordination happens where the build is seen.

  • RF coordination
  • Backhaul planning
  • On the site map
  • Coordinated across sites

Permits & compliance

Jurisdictional holds, surfaced early.

Permits awaiting a decision are surfaced against the sites they block, so dependencies are worked down before they stall on-air.

  • Permit status and approvals
  • Geo-fenced compliance
  • Holds surfaced against sites
  • Dependencies worked early

Operational risk & alarms

Risk on the rollout view.

Operational risk index, red sites and P1 escalations sit on the rollout view, so risk is read beside the build.

  • Operational risk index
  • Red sites surfaced
  • P1 alarm escalation
  • Risk beside the build

Telecom, end to end.

  1. Map every site

    Macro, small-cell, DAS and C-RAN sites show on one geospatial map.

  2. Move through activation

    Each site progresses through Build, Integration and On-Air on one pipeline.

  3. Coordinate RF and backhaul

    RF coordination and backhaul sit on the same map as the sites.

  4. Unblock permits early

    Jurisdictional holds are surfaced against the sites they block, so dependencies are worked down before they stall on-air.

  5. Steer to on-air

    Rollout velocity and the bottleneck stage are live, so the highest-leverage move is surfaced.

The network build, steered to on-air.

Entroid runs the network rollout as one command center, from plan to on-air.